To be able to burn waste at energy from waste power stations, waste grabs must be fully maintained. A grab refurbishment is like a car MOT on steroids. You can do the bare minimum, or you can upgrade hydraulic faults and solve wear issues to dramatically increase the working hours thus reducing downtime.